Skip to product information
1 of 1

Daniel Constantin Diaconu

Force Majeure in the Hydropower Industry: Concepts and Case Studies

Force Majeure in the Hydropower Industry: Concepts and Case Studies

YOU SAVE £6.12

Regular price £38.87 GBP
Regular price £44.99 GBP Sale price £38.87 GBP
13% OFF Sold out
Tax included. Shipping calculated at checkout.
  • Condition: Brand new
  • UK Delivery times: Usually arrives within 2 - 3 working days
  • UK Shipping: Fee starts at £2.39. Subject to product weight & dimension
Dispatches within 7 to 10 working days
Trustpilot 4.5 stars rating  Excellent
We're rated excellent on Trustpilot.
  • More about Force Majeure in the Hydropower Industry: Concepts and Case Studies


This book discusses the challenges faced by hydropower companies due to force majeure, analyzing water usage in electricity production and the concept of force majeure in contracts. It presents examples from the international level and discusses the situation in Romania when the largest supplier of electricity terminated contracts invoking force majeure.

Format: Paperback / softback
Length: 156 pages
Publication date: 23 March 2023
Publisher: Springer International Publishing AG


This book aims to shed light on the unique challenges faced by certain hydropower companies due to the inability to fulfill their contracts due to force majeure. The first part of this book delves into the analysis of water's role in electricity production, emphasizing that all energy sources, albeit to varying degrees, utilize water. The spatial and temporal availability of water is crucial, particularly in the context of hydropower. The focus will be on hydropower, presenting the current global situation and the impact of reducing river water levels.

The second part of the book focuses on the concept of force majeure and the various ways in which it can be presented and drafted in contracts. The provisions of this article play a pivotal role in resolving disputes and the success of contracts. However, there are instances where signatory parties may misuse or fail to receive protection from these force majeure provisions. By drawing from brief examples from the international arena, the book expands into a comprehensive discussion of the situation in Romania, where the largest electricity supplier based on water terminated multiple contracts, invoking force majeure. The analysis examines the manner in which the opinions of the involved parties are presented to the court, providing detailed insights.

Weight: 267g
Dimension: 235 x 155 (mm)
ISBN-13: 9783031274015
Edition number: 1st ed. 2023

UK and International shipping information

UK Delivery and returns information:

  • Delivery within 2 - 3 days when ordering in the UK.
  • Shipping fee for UK customers from £2.39. Fully tracked shipping service available.
  • Returns policy: Return within 30 days of receipt for full refund.

International deliveries:

Shulph Ink now ships to Australia, Canada, France, Ireland, Italy, Germany, Spain, Netherlands, New Zealand, United States of America, Belgium, India, United Arab Emirates.

  • Delivery times: within 5 - 10 days for international orders.
  • Shipping fee: charges vary for overseas orders. Only tracked services are available for international orders.
  • Customs charges: If ordering to addresses outside the United Kingdom, you may or may not incur additional customs and duties fees during local delivery.
View full details